You should plan for about a week for the entire process. The floor must be prepped, built and sanded. Once dust is removed, the type of sealant will determine the drying time. Oil based tends to take longer – often 3-4 days plus drying time (longer if for larger jobs) and water based tends to dry faster, so it’s often 2 days (longer for larger jobs).